Motion Computing FWS-DS1 Manuel d'utilisateur Page 193

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 257
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 192
GTE
-
Florida
Wholesale Non-recurring Cost
Study
Provisioning
-
Advanced/Special
Products
Dark
Fiber
-
Work
Times
Ln
Description
Dark Fiber
Preordering
Exchange Facilities
Design Group
Access
OSP
En-beer
Construction
Splicei
i
Total
Inter-office Facilities
Design Group
Access
I
OSP
Engineer
Total
Network
Construction
Splicei
7
OSP
Engineer
8
Construction
Splicei
9
Total
Source Minutes Destination
A=Note
1
219.25
APLC-1
24.00
APLC-1
urn
Lns
(1.2)
243.25
APRI-1
205.00
APLC-1
60.00
APLC-1
urn
Lns
(4.5)
265.00
APRI-1
209.50
APLC-1
APLC-1
urn
Lns
(7.8)
209.50
APRI-1
Note
1:
The
work times listed were developed through interviews with Engineering Supervisors
and
Staff
Support.
GTE
Confidential
AFMC-1
Vue de la page 192
1 2 ... 188 189 190 191 192 193 194 195 196 197 198 ... 256 257

Commentaires sur ces manuels

Pas de commentaire